services

 Lic. # 1010593

San Diego City College: Computer Lab Electrical Infrastructure.

MCB Camp Pendleton: VFD's & Motor Controls  for Potable Water Pump Station.

Naval Base Point Loma Force Main: Leak Detection  Infrastructure & Controls.

Ongoing Projects

Naval Base San Diego: Main Electrical Service Upgrade.

Steelcore Electric, Inc. will install a new Main Electrical Service at 32nd St. Naval Base CIAT Trainer Building to include a 750 KVA Transformer, 1200 Main Switchboard, 4" under ground duct bank with associated 15 kv and 480 volt underground distribution feeder wires.

Call (760)571-7176

" BUILDING QUALITY PROJECTS "

Completed Projects

  • New construction


  • Interior/exterior main distribution


  • Tenant improvements


  • Lighting and power infrastructure


  • Transformer and switchgear installation and replacement


  • Generator and A.T.S. installation and replacement


  • UPS and backup equipment installation


  • P.V. panels and interconnecting equipment


  • Main underground distribution


  • Branch underground distribution


  • Main and branch panel installation


  • Electrical installation in hazardous locations


  • Florescent to L.E.D. lighting upgrade


  • Lighting and lighting controls


  • Runway and parking lot lighting 
  • Electric sign installation

MCB Camp Pendleton: Crosswalk Lighting.